Daniel and Helga Kroll in Lublin, WI (June 2014) « Back to Project Gallery

This 6.4kW array was done in June of 2014. The racking is an engineered design to have an adjustable tilt for different sun angles throughout the year. The racking is also ballasted meaning we did not have to bore holes and permanently fix the array with concrete. We used a Fronius IG 6.0-1 inverter in the home to condition the PV power from DC to AC.

btn hover btn hover